Get a Quote(206) 427-8907
Electrical · Greater Seattle

Electrical Panel Upgrade — Greater Seattle

Most panel upgrades in Greater Seattle run $2,200 to $4,500, depending on amperage and panel brand. This covers replacing an old fuse box or undersized panel with a new 150-200 amp panel, updated breakers, grounding, and permit coordination with local jurisdictions. Homeowners typically need this when adding an EV charger, heat pump, or hot tub, or when wiring is outdated.

Licensed, bonded & insured in WashingtonMon–Fri 8am–6pm · 24/7 emergencies
Electrical Panel Upgrade in Greater Seattle — SPS Pro Services technician on a electrical job

An electrical panel upgrade replaces your home's main service panel with a new one sized for current and future loads, typically stepping up from 100 amp to 150 or 200 amp service. The job includes a new panel and breakers, grounding and bonding updates, coordination with PSE or Snohomish PUD for the service connection, and permit inspection through your city. Older homes across King and Snohomish counties often need this before adding central AC, an EV charger, or a heat pump.

Symptoms we see daily

Signs you need electrical panel upgrade

Breakers trip repeatedly when running the microwave, AC, and dryer at the same time

Your panel is a fuse box or shows less than 100 amp service on the label

Lights flicker or dim when a large appliance starts up

The panel cover feels warm, smells burnt, or shows rust or discoloration

You're adding a heat pump, EV charger, or hot tub and the panel can't support the extra load

No surprises

How a electrical panel upgrade visit works

1

Site assessment

An electrician inspects the existing panel, wiring condition, and runs a load calculation to size the new panel correctly.

2

Permit and utility coordination

We pull the electrical permit with your city and coordinate any temporary shutoff needed with PSE or Snohomish PUD.

3

Panel installation

Power is shut off, the old panel is removed, and the new panel, breakers, and grounding are installed to code.

4

Inspection

The local electrical inspector reviews the work and signs off before the panel is energized and put back into service.

5

Walkthrough

We label the new panel, walk through the breaker layout with you, and answer questions about the upgraded system.

What moves the price

Why quotes range from $2,200 to $4,500

These factors decide where your job lands in the range — and we walk you through each one on the written quote.

  • Target amperage, since a 100 to 150 amp upgrade costs less than a jump to 200 amp service
  • Whether the service line from the street also needs upgrading, not just the panel itself
  • Panel location, since a finished wall may need drywall repair after the swap versus an open basement
  • City permit and inspection fees, which vary between Seattle and other King and Snohomish County jurisdictions
Flat-rate pricing

Electrical Panel Upgrade — what it costs

Conservative ranges for the Seattle metro. Your written quote is exact before work begins.

JobTypical price
In-home estimateExact flat quote for your homeFree
Standard electrical panel upgradeTypical single-system job$2,200–$2,970
Mid-range electrical panel upgradeHigher-capacity or multi-zone equipment$2,970–$3,730
Complex electrical panel upgradePremium equipment or difficult access$3,730–$4,500
Prices reviewed by Sergei Petrov · July 2026. Parts availability can shift ranges — the quote you sign is final.
24/7 Emergency Line

No power at 11pm? We pick up.

Office hours are Mon–Fri, but the emergency line never closes. Call any hour and we dispatch a licensed tech across Greater Seattle.

Emergency dispatch
Straight answers

Electrical Panel Upgrade questions we hear most

How long does a panel upgrade take?

Most upgrades take one full day, from shutoff to inspection-ready. Power is off for roughly 4 to 8 hours during the swap. If the service line from the street also needs upgrading or the utility has to schedule a meter change, the job can stretch to two days.

Do I need a permit for a panel upgrade in Seattle or Snohomish County?

Yes. Every jurisdiction in King and Snohomish counties requires an electrical permit and inspection for panel replacement. SPS Pro Services pulls the permit and schedules the inspection as part of the job, so you don't have to deal with the city directly.

Will my power be shut off during the upgrade?

Yes, power is off for the hours it takes to disconnect the old panel and connect the new one, usually 4 to 8 hours. We coordinate the outage window with you in advance so you can plan around it and keep refrigerators closed during that stretch.

Is 200 amp service enough for a heat pump and EV charger?

For most single-family homes, 200 amp service covers a heat pump, EV charger, and standard appliances with room to spare. Larger homes with electric everything, a hot tub, and multiple EV chargers sometimes need a load calculation to confirm, which we include in the initial assessment.

Marcus Reed, Senior Electrician at SPS Pro Services

Marcus Reed

Senior Electrician, SPS Pro Services

Washington 01 Journey Level Electrician12+ years in the trade

Reviews the pricing and service guidance on this page against SPS Pro Services's actual job records across King and Snohomish counties.

Prices reviewed July 2026

Electrical Panel Upgrade available in your city

King & Snohomish counties — local pages with city-specific pricing notes.

Need electrical panel upgrade? Get a straight answer today.

Call (206) 427-8907, Monday through Friday 8am to 6pm, to schedule a panel assessment, or select your city below for local scheduling.

Call (206) 427-8907